Visy

Visy
6 Herbert Place, Smithfield, NSW

CTFD Group Pty Ltd were engaged by Visy to deliver their in-house designed gas steam headers that supply the steam to power the Visy Smithfield plant. The design by Visy of the facility required detail engineering and civil works to deliver out-of-ground requirements. This included all civil works, all concrete footings and foundations, base slabs and internal drainage requirements, along with holding down bolts for a 60 metre chimney and factory floor to meet point loads of in excess of 600 tonnes.

“David and the team at CTFD Group were great to work with.They assisted us in all areas, including land acquisition, building design, construction management phase and worked closely with our senior team from a green field site to key in the door."
Paul Vawdrey
National Sales Director Vawdrey Australia
Client | Visy
Architects | Algorry Zappia and Associates
Engineering | Algorry Zappia and Associates
Project Management By CTFD Group
Delivery construction | By CTFD
Steam Header Footprint | 1,000 sqm
Civil Works | Terra Civil
Concrete Placement | Nicsons Concrete